[{"data":1,"prerenderedAt":86},["ShallowReactive",2],{"articles-approval-for-energy-line-project-in-san-bartolom-de-tirajana-2026-05-11-100960":3},{"id":4,"title":5,"body":6,"date":74,"description":75,"extension":76,"meta":77,"navigation":81,"path":82,"seo":83,"stem":84,"__hash__":85},"articles/articles/approval-for-energy-line-project-in-san-bartolom-de-tirajana-2026-05-11-100960.md","Approval for Energy Line Project in San Bartolomé de Tirajana",{"type":7,"value":8,"toc":65},"minimal",[9,14,19,23,26,30,38,48,52,55,58,62],[10,11,13],"h1",{"id":12},"construction-approval-for-high-voltage-power-line-in-spain","Construction Approval for High-Voltage Power Line in Spain",[15,16,18],"h2",{"id":17},"project-overview","Project Overview",[20,21,22],"p",{},"The Spanish government has authorized the construction of a high-voltage power line connecting Barranco de Tirajana to Santa Águeda. This project is managed by Red Eléctrica de España.",[20,24,25],{},"This approval includes declaring the installation of public utility, which allows for the urgent expropriation of land needed for the infrastructure.",[15,27,29],{"id":28},"landowners-meeting-details","Landowners' Meeting Details",[20,31,32,33,37],{},"Affected property owners are scheduled to meet on ",[34,35,36],"strong",{},"May 21, 2026",", to formalize the possession of their land. The meeting will take place at the local town hall in San Bartolomé de Tirajana.",[39,40,41,45],"ul",{},[42,43,44],"li",{},"Owners and rights-holders must present identification and proof of property ownership.",[42,46,47],{},"If landowners cannot attend due to force majeure, the process will be rescheduled the next working day.",[15,49,51],{"id":50},"project-goals-and-significance","Project Goals and Significance",[20,53,54],{},"This project aims to improve Spain’s energy grid, supporting energy stability and integration.",[20,56,57],{},"The approval underscores the government’s commitment to infrastructure development, even if it means compulsory land acquisition.",[15,59,61],{"id":60},"transparency-and-legal-process","Transparency and Legal Process",[20,63,64],{},"The official bulletin emphasizes transparency, inviting claims or corrections from affected parties before actual expropriation moves forward.",{"title":66,"searchDepth":67,"depth":68,"links":69},"",2,3,[70,71,72,73],{"id":17,"depth":67,"text":18},{"id":28,"depth":67,"text":29},{"id":50,"depth":67,"text":51},{"id":60,"depth":67,"text":61},"2026-05-11","The Spanish government has authorized the construc...","md",{"category":78,"author":79,"link":80},"environment-and-sustainability","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/089/1548.html",true,"/articles/approval-for-energy-line-project-in-san-bartolom-de-tirajana-2026-05-11-100960",{"title":5,"description":75},"articles/approval-for-energy-line-project-in-san-bartolom-de-tirajana-2026-05-11-100960","jlL61Y6Jj7EVaYJIuqsKbpo8nOMICi2kC3Icqaw2kyY",1779822443996]