[{"data":1,"prerenderedAt":151},["ShallowReactive",2],{"articles-approval-of-hybrid-battery-storage-system-at-jedey-wind-farm-in-la-gomera-2026-04-27-96524":3},{"id":4,"title":5,"body":6,"date":139,"description":140,"extension":141,"meta":142,"navigation":146,"path":147,"seo":148,"stem":149,"__hash__":150},"articles/articles/approval-of-hybrid-battery-storage-system-at-jedey-wind-farm-in-la-gomera-2026-04-27-96524.md","Approval of Hybrid Battery Storage System at Jedey Wind Farm in La Gomera",{"type":7,"value":8,"toc":130},"minimal",[9,14,19,23,27,62,66,93,97,124],[10,11,13],"h1",{"id":12},"canary-islands-hybrid-energy-storage-project","Canary Islands Hybrid Energy Storage Project",[15,16,18],"h2",{"id":17},"project-overview","Project Overview",[20,21,22],"p",{},"The Canary Islands government has officially approved the development of a 2 MW hybrid energy storage project connected to the existing Jedey Wind Farm in La Gomera. This initiative aims to improve energy efficiency by integrating advanced battery systems that will store and release renewable energy, reducing reliance on fossil fuels and lowering electricity costs.",[15,24,26],{"id":25},"technical-details","Technical Details",[28,29,30,45,48],"ul",{},[31,32,33,34],"li",{},"The project includes:",[28,35,36,39,42],{},[31,37,38],{},"Two 4.5 MWh battery systems",[31,40,41],{},"12 inverters",[31,43,44],{},"A transformation center",[31,46,47],{},"All components are connected via updated infrastructure to the current wind farm, which has a capacity of 2.35 MW.",[31,49,50,51],{},"This setup allows for:",[28,52,53,56,59],{},[31,54,55],{},"Energy to be stored during periods of low demand",[31,57,58],{},"Dispatched during peak times",[31,60,61],{},"Boosting grid stability",[15,63,65],{"id":64},"environmental-and-strategic-impact","Environmental and Strategic Impact",[28,67,68,76,90],{},[31,69,70,71],{},"Environmental assessments confirm that:",[28,72,73],{},[31,74,75],{},"The project will not harm protected natural spaces or biodiversity.",[31,77,78,79],{},"It aligns with the Canary Islands' goals to:",[28,80,81,84,87],{},[31,82,83],{},"Advance renewable energy",[31,85,86],{},"Combat climate change",[31,88,89],{},"Achieve a decarbonized economy by 2040.",[31,91,92],{},"The project’s expedited approval underscores its importance amid the regional energy crisis and the urgency of increasing renewable energy investments.",[15,94,96],{"id":95},"budget-and-benefits","Budget and Benefits",[28,98,99,102,110],{},[31,100,101],{},"Budget: Over 2.6 million euros",[31,103,104,105],{},"Environmental benefits:",[28,106,107],{},[31,108,109],{},"Reducing over 4,400 tons of annual CO₂ emissions",[31,111,112,113],{},"Broader implications:",[28,114,115,118,121],{},[31,116,117],{},"Enhancing energy security",[31,119,120],{},"Supporting economic growth in La Gomera",[31,122,123],{},"Contributing to Spain's national objective of expanding clean energy sources",[125,126,127],"blockquote",{},[20,128,129],{},"\"The Canary Islands' commitment to renewable energy is critical for our future and regional sustainability.\"",{"title":131,"searchDepth":132,"depth":133,"links":134},"",2,3,[135,136,137,138],{"id":17,"depth":132,"text":18},{"id":25,"depth":132,"text":26},{"id":64,"depth":132,"text":65},{"id":95,"depth":132,"text":96},"2026-04-27","The Canary Islands government has officially appro...","md",{"category":143,"author":144,"link":145},"environment-and-sustainability","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/080/1346.html",true,"/articles/approval-of-hybrid-battery-storage-system-at-jedey-wind-farm-in-la-gomera-2026-04-27-96524",{"title":5,"description":140},"articles/approval-of-hybrid-battery-storage-system-at-jedey-wind-farm-in-la-gomera-2026-04-27-96524","Y5GbEakMzOWeVGQ9n0XfM7bkq2DuLSq8Gze_ROPhGaY",1779822444861]