[{"data":1,"prerenderedAt":140},["ShallowReactive",2],{"articles-authorization-granted-for-expansion-of-puerto-del-rosario-electricity-substation-in-fuerteventura-2026-07-10-118685":3},{"id":4,"title":5,"body":6,"date":128,"description":129,"extension":130,"meta":131,"navigation":135,"path":136,"seo":137,"stem":138,"__hash__":139},"articles/articles/authorization-granted-for-expansion-of-puerto-del-rosario-electricity-substation-in-fuerteventura-2026-07-10-118685.md","Authorization Granted for Expansion of Puerto del Rosario Electricity Substation in Fuerteventura",{"type":7,"value":8,"toc":118},"minimal",[9,14,19,23,26,36,44,48,51,59,63,66,77,81,84,92,95,100,104,107],[10,11,13],"h1",{"id":12},"expansion-and-modification-of-puerto-del-rosario-66-kv-substation-on-fuerteventura","Expansion and Modification of Puerto del Rosario 66 kV Substation on Fuerteventura",[15,16,18],"h2",{"id":17},"overview","Overview",[20,21,22],"p",{},"The Spanish government has officially approved plans to expand and modify the Puerto del Rosario 66 kV substation on Fuerteventura.",[20,24,25],{},"Red Eléctrica de España requested authorization in March 2026 to upgrade the facility, which involves:",[27,28,29,33],"ul",{},[30,31,32],"li",{},"Renewing protection panels",[30,34,35],{},"Creating a new connection point",[20,37,38,39,43],{},"This project aims to bolster local electricity infrastructure and aligns with national efforts to strengthen energy resilience, particularly highlighted in the ",[40,41,42],"strong",{},"Energy Transport Network Development Plan for 2021-2026",".",[15,45,47],{"id":46},"public-consultation","Public Consultation",[20,49,50],{},"Public consultation confirmed:",[27,52,53,56],{},[30,54,55],{},"No objections from local authorities or environmental agencies",[30,57,58],{},"The project poses no significant risks to protected species or areas",[15,60,62],{"id":61},"strategic-importance","Strategic Importance",[20,64,65],{},"The approval reflects the strategic importance of:",[27,67,68,71,74],{},[30,69,70],{},"Enhancing energy stability for residents",[30,72,73],{},"Supporting the island’s growing demand",[30,75,76],{},"Improving the integration of renewable energy sources",[15,78,80],{"id":79},"regulations-and-timeline","Regulations and Timeline",[20,82,83],{},"The permit requires:",[27,85,86,89],{},[30,87,88],{},"Construction to adhere to technical regulations",[30,90,91],{},"Work to be carried out by qualified high-voltage installers",[20,93,94],{},"The approved plan aims to:",[27,96,97],{},[30,98,99],{},"Complete the project within 12 months",[15,101,103],{"id":102},"broader-impact","Broader Impact",[20,105,106],{},"This development is a key step in:",[27,108,109,112,115],{},[30,110,111],{},"Ensuring reliable power supply for Fuerteventura",[30,113,114],{},"Supporting economic growth",[30,116,117],{},"Promoting sustainability efforts",{"title":119,"searchDepth":120,"depth":121,"links":122},"",2,3,[123,124,125,126,127],{"id":17,"depth":120,"text":18},{"id":46,"depth":120,"text":47},{"id":61,"depth":120,"text":62},{"id":79,"depth":120,"text":80},{"id":102,"depth":120,"text":103},"2026-07-10","The Spanish government has officially approved pla...","md",{"category":132,"author":133,"link":134},"environment-and-sustainability","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/138/2447.html",true,"/articles/authorization-granted-for-expansion-of-puerto-del-rosario-electricity-substation-in-fuerteventura-2026-07-10-118685",{"title":5,"description":129},"articles/authorization-granted-for-expansion-of-puerto-del-rosario-electricity-substation-in-fuerteventura-2026-07-10-118685","1UgvpeRmAdQMDEM1RVHGU9kdOpJ2az_AayNfuVti2VY",1785069202223]