[{"data":1,"prerenderedAt":105},["ShallowReactive",2],{"articles-concession-granted-for-wastewater-pumping-station-project-in-garachico-tenerife-2026-05-18-103261":3},{"id":4,"title":5,"body":6,"date":93,"description":94,"extension":95,"meta":96,"navigation":100,"path":101,"seo":102,"stem":103,"__hash__":104},"articles/articles/concession-granted-for-wastewater-pumping-station-project-in-garachico-tenerife-2026-05-18-103261.md","Concession Granted for Wastewater Pumping Station Project in Garachico, Tenerife",{"type":7,"value":8,"toc":84},"minimal",[9,14,19,34,38,46,50,69,73],[10,11,13],"h1",{"id":12},"spanish-government-approves-concession-for-wastewater-pumping-station-project-in-garachico","Spanish Government Approves Concession for Wastewater Pumping Station Project in Garachico",[15,16,18],"h2",{"id":17},"project-overview","Project Overview",[20,21,22,31],"ul",{},[23,24,25,26,30],"li",{},"The Spanish government has officially approved a concession for the project ",[27,28,29],"strong",{},"'Outfall of the Wastewater Pumping Station (EBAR) La Piscina' in Garachico, Tenerife",".",[23,32,33],{},"This approval formalizes the land occupancy needed for the station, which is crucial for managing urban wastewater and reducing flood risks, especially after recent flooding episodes in the area.",[15,35,37],{"id":36},"project-details","Project Details",[20,39,40,43],{},[23,41,42],{},"The project, initially reviewed in 2014, involves legalizing existing infrastructure designed to divert excess wastewater safely into the sea.",[23,44,45],{},"Most of the work is minimal in scale, mainly outside the direct marine environment, and does not significantly impact the local coastline or marine life.",[15,47,49],{"id":48},"regulatory-and-environmental-aspects","Regulatory and Environmental Aspects",[20,51,52,55,66],{},[23,53,54],{},"Legal procedures, environmental assessments, and interactions with maritime agencies have been successfully completed.",[23,56,57,58,61,62,65],{},"The concession period is set for ",[27,59,60],{},"30 years",", renewable for an additional ",[27,63,64],{},"15 years",", ensuring long-term operation.",[23,67,68],{},"The project must comply with environmental protections, including nearby Natura 2000 sites, and follow strict guidelines to avoid damage to the coastline or marine ecosystems.",[15,70,72],{"id":71},"benefits-and-implications","Benefits and Implications",[20,74,75,78,81],{},[23,76,77],{},"This concession strengthens Garachico’s resilience against flooding.",[23,79,80],{},"Maintains public access and environmental integrity.",[23,82,83],{},"Exemplifies Spain's approach to balancing infrastructural development with ecological responsibility, vital for residents and expats living in the region.",{"title":85,"searchDepth":86,"depth":87,"links":88},"",2,3,[89,90,91,92],{"id":17,"depth":86,"text":18},{"id":36,"depth":86,"text":37},{"id":48,"depth":86,"text":49},{"id":71,"depth":86,"text":72},"2026-05-18","The Spanish government has officially approved a c...","md",{"category":97,"author":98,"link":99},"housing-and-infrastructure","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/094/1628.html",true,"/articles/concession-granted-for-wastewater-pumping-station-project-in-garachico-tenerife-2026-05-18-103261",{"title":5,"description":94},"articles/concession-granted-for-wastewater-pumping-station-project-in-garachico-tenerife-2026-05-18-103261","DoKYiVBDnG0fCQlzB8dxqf2QlRHByR4tOLw59V0LBGU",1779822443677]