[{"data":1,"prerenderedAt":109},["ShallowReactive",2],{"articles-emergency-power-plant-proposal-approved-in-gran-canaria-2026-04-28-96813":3},{"id":4,"title":5,"body":6,"date":97,"description":98,"extension":99,"meta":100,"navigation":104,"path":105,"seo":106,"stem":107,"__hash__":108},"articles/articles/emergency-power-plant-proposal-approved-in-gran-canaria-2026-04-28-96813.md","Emergency Power Plant Proposal Approved in Gran Canaria",{"type":7,"value":8,"toc":88},"minimal",[9,14,19,23,33,37,40,54,57,61,64,70,74,77,85],[10,11,13],"h1",{"id":12},"canary-islands-emergency-power-plant-project","Canary Islands Emergency Power Plant Project",[15,16,18],"h2",{"id":17},"project-overview","Project Overview",[20,21,22],"p",{},"The Canary Islands government has announced plans to approve a new emergency power plant in Telde, Gran Canaria, developed by Disa Generación. The project involves:",[24,25,26,30],"ul",{},[27,28,29],"li",{},"Installing a 14.8 MW electricity generation facility powered by generators and propane storage.",[27,31,32],{},"Aiming to boost local energy resilience.",[15,34,36],{"id":35},"location-and-infrastructure","Location and Infrastructure",[20,38,39],{},"Located in the El Goro industrial zone, the plant will include:",[24,41,42,45,48,51],{},[27,43,44],{},"Storage tanks for propane",[27,46,47],{},"A propane tanker loading dock",[27,49,50],{},"Eight generators",[27,52,53],{},"Auxiliary electrical buildings",[20,55,56],{},"Additionally, a substation will connect this plant to the existing grid, improving energy distribution in the area.",[15,58,60],{"id":59},"public-consultation","Public Consultation",[20,62,63],{},"Authorities have opened a public consultation period lasting 30 days, inviting residents and businesses to review project details and submit comments or objections.",[65,66,67],"blockquote",{},[20,68,69],{},"This transparency aims to involve the local community in decisions about infrastructure that could impact their environment and energy supply.",[15,71,73],{"id":72},"broader-context","Broader Context",[20,75,76],{},"The new plant is part of broader efforts to:",[24,78,79,82],{},[27,80,81],{},"Diversify energy sources",[27,83,84],{},"Ensure a reliable power supply for Gran Canaria",[20,86,87],{},"The investment, valued at over 27 million euros, underscores the island’s focus on maintaining energy stability while integrating cleaner, emergency power options.",{"title":89,"searchDepth":90,"depth":91,"links":92},"",2,3,[93,94,95,96],{"id":17,"depth":90,"text":18},{"id":35,"depth":90,"text":36},{"id":59,"depth":90,"text":60},{"id":72,"depth":90,"text":73},"2026-04-28","The Canary Islands government has announced plans ...","md",{"category":101,"author":102,"link":103},"environment-and-sustainability","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/081/1376.html",true,"/articles/emergency-power-plant-proposal-approved-in-gran-canaria-2026-04-28-96813",{"title":5,"description":98},"articles/emergency-power-plant-proposal-approved-in-gran-canaria-2026-04-28-96813","MGX0c__UONYyC04Z-uBLQyh4hr5Vgprue_14Dkkq3PM",1779822444825]