Energy Storage Project Approved for Solar Plant in Gran Canaria
Published: March 31, 2026|environment-and-sustainability|Gobierno de Canarias
Upgrade of Cardonera Photovoltaic Solar Facility in Agüimes
Luis de Valdivia, S.L., plans to upgrade the Cardonera Photovoltaic Solar Facility in Agüimes, Gran Canaria, with a large-scale battery storage system.
Project Details
- This addition marks a significant change, transforming the existing solar park into a hybrid power plant that combines solar generation with energy storage.
- The project involves installing four battery units with a total capacity of 18 MWh, along with advanced power conversion and infrastructure to connect the system to the grid.
Benefits and Significance
"This development is notable because it enhances the energy facility’s capacity to store renewable energy, making it more resilient and efficient." "It supports Spain’s broader push toward greener, more reliable energy sources by integrating storage to better manage supply and demand."
Regulatory Process
- The project, valued at over four and a half million euros, requires administrative approval and public consultation as mandated by regional energy laws.
- Authorities have opened a 30-day window for public feedback before final approval.
Impact
- For residents and investors, this move signifies a step forward in modernizing the country’s renewable infrastructure, promising a more sustainable and stable energy future in the Canary Islands.