Energy Storage Project Proposed for Solar Park in Gran Canaria
Published: October 20, 2025|environment-and-sustainability|Gobierno de Canarias
Atlantic Generation Battery Storage Project at Balos Photovoltaic Park
Project Overview
- Atlantic Generation, S.L. plans to add a battery storage system to the Balos Photovoltaic Park in Santa LucĆa de Tirajana, Gran Canaria.
- The project involves installing a large container with 12 racks of lithium iron phosphate (LiFePO4) batteries.
- The storage capacity will be up to 5.016 MWh of energy.
- This addition will transform the existing 1.6 MW solar park into a hybrid facility.
- The goal is to enable better management of electricity supply and support renewable energy integration in the region.
Authorization and Public Engagement
- The project requires official authorization due to its significant modification to the original solar installation.
- Public information sessions are scheduled.
- Interested parties have 30 days from October 20, 2025, to review technical documents and submit comments.
Goals and Impact
- The development aims to enhance local energy stability and sustainability.
- It aligns with broader efforts to boost renewable sources in the Canary Islands.
- The project highlights Spainās ongoing push to modernize renewable energy infrastructure, making solar power more flexible and reliable.
Investment and Planning
- The total investment is approximately ā¬673,552.
- Planning permission will define how this infrastructure impacts local energy grids and residents.
This initiative highlights Spainās ongoing push to modernize renewable energy infrastructure, making solar power more flexible and reliable for communities dependent on sustainable sources.