[{"data":1,"prerenderedAt":105},["ShallowReactive",2],{"articles-green-energy-project-in-tenerife-gets-official-approval-for-underground-power-line-2026-05-27-106107":3},{"id":4,"title":5,"body":6,"date":93,"description":94,"extension":95,"meta":96,"navigation":100,"path":101,"seo":102,"stem":103,"__hash__":104},"articles/articles/green-energy-project-in-tenerife-gets-official-approval-for-underground-power-line-2026-05-27-106107.md","Green Energy Project in Tenerife Gets Official Approval for Underground Power Line",{"type":7,"value":8,"toc":83},"minimal",[9,14,19,23,27,30,43,46,54,58,61,69,73,76,80],[10,11,13],"h1",{"id":12},"spanish-government-approves-high-voltage-power-line-undergrounding-in-arico","Spanish Government Approves High-Voltage Power Line Undergrounding in Arico",[15,16,18],"h2",{"id":17},"project-overview","Project Overview",[20,21,22],"p",{},"The Spanish government has officially authorized the undergrounding of a high-voltage power line in Arico, Tenerife, as part of the Pocitos Wind Park project. This move, sanctioned by the General Directorate of Energy, aims to improve the local landscape and support renewable energy development. The declaration of public utility means land rights must be temporarily acquired from affected property owners to facilitate the project.",[15,24,26],{"id":25},"land-and-property-procedures","Land and Property Procedures",[20,28,29],{},"Property owners and rights holders affected by the project are required to attend scheduled meetings on June 2 and 3, 2026, to formalize the process of land occupation. Those involved must bring:",[31,32,33,37,40],"ul",{},[34,35,36],"li",{},"Identification",[34,38,39],{},"Proof of ownership",[34,41,42],{},"Recent property tax receipts",[20,44,45],{},"If necessary, they can also include",[31,47,48,51],{},[34,49,50],{},"Experts",[34,52,53],{},"Notaries\nat their own expense. The process aims to ensure a smooth transition, respecting legal procedures for expropriation.",[15,55,57],{"id":56},"beneficiary-and-purpose","Beneficiary and Purpose",[20,59,60],{},"The project’s beneficiary is Sistemas Energéticos Ladera Negra, S.A., which will undertake the undergrounding of the power line to:",[31,62,63,66],{},[34,64,65],{},"Reduce visual impact",[34,67,68],{},"Enhance local sustainability efforts",[15,70,72],{"id":71},"rights-and-contests","Rights and Contests",[20,74,75],{},"The official notice also allows affected individuals to contest or clarify any issues related to the land acquisition before the process finalizes.",[15,77,79],{"id":78},"context-and-implications","Context and Implications",[20,81,82],{},"Overall, this development highlights Spain’s ongoing push toward renewable energy, despite some land and property adjustments that come with infrastructure upgrades. For residents, it’s a sign that sustainable progress is happening, with clear legal pathways in place.",{"title":84,"searchDepth":85,"depth":86,"links":87},"",2,3,[88,89,90,91,92],{"id":17,"depth":85,"text":18},{"id":25,"depth":85,"text":26},{"id":56,"depth":85,"text":57},{"id":71,"depth":85,"text":72},{"id":78,"depth":85,"text":79},"2026-05-27","The Spanish government has officially authorized t...","md",{"category":97,"author":98,"link":99},"environment-and-sustainability","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/101/1785.html",true,"/articles/green-energy-project-in-tenerife-gets-official-approval-for-underground-power-line-2026-05-27-106107",{"title":5,"description":94},"articles/green-energy-project-in-tenerife-gets-official-approval-for-underground-power-line-2026-05-27-106107","iInXQ3_PDBFoTaSbfogqV0i9DEolKkjUnVZCaHSrHQw",1785069205770]