[{"data":1,"prerenderedAt":121},["ShallowReactive",2],{"articles-public-consultation-for-battery-storage-facility-in-vega-de-san-mateo-canary-islands-2026-06-17-112080":3},{"id":4,"title":5,"body":6,"date":109,"description":110,"extension":111,"meta":112,"navigation":116,"path":117,"seo":118,"stem":119,"__hash__":120},"articles/articles/public-consultation-for-battery-storage-facility-in-vega-de-san-mateo-canary-islands-2026-06-17-112080.md","Public Consultation for Battery Storage Facility in Vega de San Mateo, Canary Islands",{"type":7,"value":8,"toc":100},"minimal",[9,14,19,57,61,68,76,80,88,92],[10,11,13],"h1",{"id":12},"canary-islands-battery-energy-storage-system-project","Canary Islands' Battery Energy Storage System Project",[15,16,18],"h2",{"id":17},"project-overview","Project Overview",[20,21,22,26,29,40,51,54],"ul",{},[23,24,25],"li",{},"The Canary Islands' General Directorate of Energy announced a public consultation for a proposed battery energy storage system in Vega de San Mateo.",[23,27,28],{},"The project is named 'BESS Sirius IX San Mateo.'",[23,30,31,32],{},"It aims to install lithium-ion battery containers with:\n",[20,33,34,37],{},[23,35,36],{},"a capacity of over 20 MWh",[23,38,39],{},"a peak power of 4.39 MW.",[23,41,42,43],{},"Location details:\n",[20,44,45,48],{},[23,46,47],{},"Situated on three parcels totaling just under 854 square meters.",[23,49,50],{},"Infrastructure includes four containers and an underground power evacuation line connecting to the local substation.",[23,52,53],{},"Budget: approximately 2.4 million euros.",[23,55,56],{},"Initial approval was granted in August 2025, with an update in November 2025 to change the location.",[15,58,60],{"id":59},"purpose-and-significance","Purpose and Significance",[62,63,64],"blockquote",{},[65,66,67],"p",{},"The move reflects a broader push in the Canary Islands to embrace energy storage solutions, crucial for integrating more renewable sources and reducing reliance on fossil fuels.",[20,69,70,73],{},[23,71,72],{},"The project supports renewable energy efforts and grid stability.",[23,74,75],{},"It aligns with Spain's initiatives to advance sustainable energy.",[15,77,79],{"id":78},"public-consultation-details","Public Consultation Details",[20,81,82,85],{},[23,83,84],{},"Duration: 30 days.",[23,86,87],{},"Purpose: To allow individuals and companies to review project details and submit comments or objections.",[15,89,91],{"id":90},"broader-context","Broader Context",[20,93,94,97],{},[23,95,96],{},"Part of Spain's efforts to promote renewable energy.",[23,98,99],{},"The initiative aims to boost local sustainable energy efforts and support grid reliability through energy storage solutions.",{"title":101,"searchDepth":102,"depth":103,"links":104},"",2,3,[105,106,107,108],{"id":17,"depth":102,"text":18},{"id":59,"depth":102,"text":60},{"id":78,"depth":102,"text":79},{"id":90,"depth":102,"text":91},"2026-06-17","The Canary Islands' General Directorate of Energy ...","md",{"category":113,"author":114,"link":115},"environment-and-sustainability","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/120/2095.html",true,"/articles/public-consultation-for-battery-storage-facility-in-vega-de-san-mateo-canary-islands-2026-06-17-112080",{"title":5,"description":110},"articles/public-consultation-for-battery-storage-facility-in-vega-de-san-mateo-canary-islands-2026-06-17-112080","YnULavUshP8FwaIlb5djRIfZEDihRuCvsWorrbhHD4g",1785069204229]