🌴 Canary Islands Government Announcements

Public Notice for a Large Solar Power Project in Tenerife

Published: June 23, 2026|environment-and-sustainability|Gobierno de Canarias

Tenerife Solar Power Project Announcement

Project Overview

The Tenerife-based Instituto Tecnológico y de Energías Renovables has announced plans for a new 977 kW solar power installation in Granadilla de Abona. This project will include:

  • Nearly 2,000 photovoltaic modules mounted on rooftops and other structures across the area.
  • A large energy storage system capable of holding 2.15 MWh, primarily using Huawei batteries.

The initiative aims to boost renewable energy use on the island, fitting into Spain’s broader push for clean, sustainable power.

Approval and Public Consultation

Before moving forward, the project requires official approval from the Canary Islands' Directorate General of Energy.

Authorities have opened a public consultation period, allowing residents and interested parties to review the detailed project documents, including environmental impact assessments, within 30 days.

  • Interested individuals can access these documents online or in person in Santa Cruz de Tenerife.

Impact and Benefits

This development signifies Tenerife’s efforts to increase renewable energy capacity, which can help:

  • Reduce reliance on imported fossil fuels
  • Cut greenhouse emissions
  • Promote energy independence on the island

For residents living nearby, it represents a step towards more sustainable local infrastructure with potential economic and environmental benefits.