[{"data":1,"prerenderedAt":94},["ShallowReactive",2],{"articles-public-notice-on-extension-of-life-for-los-guinchos-power-plant-turbine-in-la-palma-2026-04-24-95704":3},{"id":4,"title":5,"body":6,"date":82,"description":83,"extension":84,"meta":85,"navigation":89,"path":90,"seo":91,"stem":92,"__hash__":93},"articles/articles/public-notice-on-extension-of-life-for-los-guinchos-power-plant-turbine-in-la-palma-2026-04-24-95704.md","Public Notice on Extension of Life for Los Guinchos Power Plant Turbine in La Palma",{"type":7,"value":8,"toc":72},"minimal",[9,14,19,23,27,43,47,55,59,65,69],[10,11,13],"h1",{"id":12},"canary-islands-power-infrastructure-upgrade","Canary Islands Power Infrastructure Upgrade",[15,16,18],"h2",{"id":17},"project-overview","Project Overview",[20,21,22],"p",{},"The Canary Islands government has announced a plan to extend the operational life of a key turbine at the Los Guinchos thermal power station in Breña Alta, La Palma. The project, submitted by Unión Eléctrica de Canarias Generación, aims to refurbish the D13 turbine without increasing its power output, focusing on replacing major components like pistons, valves, and turbochargers to improve reliability and efficiency.",[15,24,26],{"id":25},"goals-and-focus","Goals and Focus",[28,29,30,34,37,40],"ul",{},[31,32,33],"li",{},"Maintain energy infrastructure",[31,35,36],{},"Ensure stable electricity supply for residents",[31,38,39],{},"Improve reliability and efficiency of the turbine",[31,41,42],{},"Avoid expansion of capacity or environmental impact",[15,44,46],{"id":45},"administrative-process","Administrative Process",[28,48,49,52],{},[31,50,51],{},"The project does not require an environmental assessment",[31,53,54],{},"It proceeds through administrative approval",[15,56,58],{"id":57},"public-consultation","Public Consultation",[60,61,62],"blockquote",{},[20,63,64],{},"Public consultation is now open for 30 days, allowing individuals and organizations to review detailed project plans either online or in person at the Canary Islands government’s offices in Las Palmas.",[15,66,68],{"id":67},"broader-context","Broader Context",[20,70,71],{},"This initiative reflects Spain’s broader strategy to modernize energy infrastructure amid a changing energy landscape, all while keeping local residents and stakeholders informed and involved.",{"title":73,"searchDepth":74,"depth":75,"links":76},"",2,3,[77,78,79,80,81],{"id":17,"depth":74,"text":18},{"id":25,"depth":74,"text":26},{"id":45,"depth":74,"text":46},{"id":57,"depth":74,"text":58},{"id":67,"depth":74,"text":68},"2026-04-24","The Canary Islands government has announced a plan...","md",{"category":86,"author":87,"link":88},"environment-and-sustainability","Gobierno de Canarias","https://www.gobiernodecanarias.org/boc/2026/079/1331.html",true,"/articles/public-notice-on-extension-of-life-for-los-guinchos-power-plant-turbine-in-la-palma-2026-04-24-95704",{"title":5,"description":83},"articles/public-notice-on-extension-of-life-for-los-guinchos-power-plant-turbine-in-la-palma-2026-04-24-95704","modFTR8NGf2-oITAKv8y-69cr1812BvhfhnmBGvOluQ",1779822445148]